Miri started off with a 50
cubic meter per hour gaseous oxygen plant
in 1982 and added a 25 cubic meter per hour
acetylene gas plant in 1986. By 1995, a 250
cubic meter per hour carbon dioxide plant
was installed and commissioned.
Bintulu followed by acquiring a 200 cubic
per meter per hour ASU and a 100 cubic meter
per hour acetylene gas plant. These plants
were commissioned in 1991.
By 1998, in anticipation of an increasing
demand for industrial gases, Kuching head
office installed and commissioned a 1400 cubic
meter per hour, state of the art, liquid oxygen
and nitrogen plant.
Location of Production
Plant:
Plant
Location
Liquid Oxygen /
Nitrogen
Kuching
Liquid Oxygen / Nitrogen
Bintulu
Gaseous Oxygen
Miri
Acetylene
Bintulu
Acetylene
Miri
Carbon Dioxide
Miri
LNO Plant in Kuching Largest state-of-art oxygen/nitrogen
Air Separation Unit (ASU) in East Malaysia